
The Taman Sri Muda Pump House in Shah Alam was fully functional as of last Wednesday, said Menteri Besar Amirudin Shari.
He said the failure of the flood control pump system, which was one of the causes of delays in flood control efforts in the area during heavy rains, was resolved when Tenaga Nasional Berhad (TNB) reconnected the electricity supply to the pump house involved.